# Commissioning Manager - Data Center Construction

- **Company:** KALCON
- **Location:** Cedar Rapids, IA, US (Not specified)
- **Salary:** Salary not disclosed
- **Contract:** Not specified
- **Posted:** 2026-10-30

## Job description

The Commissioning Manager serves as the Owner’s Representative responsible for oversight and coordination of the full commissioning lifecycle on large-scale, mission-critical data center projects. This role leads coordination among the General Contractor, commissioning agents, MEP subcontractors, design teams, and Owner personnel to ensure systems are installed, started up, and tested in accordance with Owner specifications and project requirements. The Commissioning Manager develops and maintains the Commissioning Plan and Schedule, tracks readiness, deficiencies, and documentation, and reports on commissioning progress and KPIs to protect turnover milestones and support a clean, timely handover.
Minimum Qualifications
Bachelor’s degree in Construction Management, Engineering, or a related field preferred, but not required with equivalent trade or superintendent experience
7–10+ years of construction or commissioning experience, with at least 5 years in data center projects
Proven experience supporting commissioning of mission-critical facilities such as data centers, semiconductor facilities, or laboratories
In-depth understanding of MEP systems, controls integration, and commissioning standards (ASHRAE, NEBB, etc.)
Ability to read and interpret multi-disciplinary construction drawings and specifications
Strong written and oral communication skills with the ability to coordinate with stakeholders at all levels
Proficiency in Microsoft Office Suite, particularly Excel and PowerPoint
Familiarity with commissioning and project software tools such as CxAlloy, Bluebeam, and Procore
Tasks and Responsibilities
Serve as the Owner’s Representative overseeing the full commissioning lifecycle of large-scale, mission-critical data center projects
Lead coordination with all commissioning stakeholders, including the General Contractor, commissioning agents, MEP subcontractors, design teams, and Owner personnel
Develop and maintain the project Commissioning Plan and Commissioning Schedule, ensuring alignment with construction and turnover milestones
Collaborate with technical and subject matter experts to draft and review commissioning process documentation in compliance with company and project standards
Review multi-disciplinary construction drawings and specifications to anticipate and mitigate commissioning-related issues
Work with the General Contractor and subcontractors to verify that systems are installed and tested in accordance with Owner specifications, state and local codes (UMC, UBC, UPC, NFPA), SMACNA, ASME, and relevant international standards
Support development of detailed start-up sequences and ensure alignment with the project schedule, developing workarounds and recovery plans where required
Administer and maintain the commissioning software platform (e.g., CxAlloy), tracking issues, checklists, test results, and closeout documentation
Coordinate and manage the sequencing of equipment and system start-up activities
Monitor and track commissioning-related RFIs, submittals, deficiency items, and action items across all active systems
Conduct and document routine site walks (minimum twice daily) to confirm field readiness for commissioning activities and verify completion of corrective actions
Interface with General Contractor Cx Managers, engineers, system owners, and vendor technicians to ensure readiness and alignment on testing protocols and responsibilities
Lead and participate in oversight of Factory Acceptance Tests (FATs), Site Acceptance Tests (SATs), and Integrated Systems Testing (IST), ensuring responsible parties complete required testing and documentation
Manage and report on commissioning Key Performance Indicators (KPIs) to internal and external stakeholders, including senior project management
Act as the primary liaison for commissioning activities in Owner-Architect-Contractor (OAC) meetings
Verify that commissioning documentation meets turnover requirements and supports a clean and timely handover
Participate in SOP creation and compliance reviews, including audits of SIPPs and Pre-Task Plans
Resolve technical questions from the field, provide RFI responses, and coordinate with design teams for clarification as needed
Benefits Offered
Medical insurance
Dental insurance
Vision insurance
Life insurance
Accident insurance
Long term disability
401(k) retirement plan with 4% KALCON match when an employee contributes at least 5%
15 days of paid time off
8 paid national holidays
Reimbursement for professional licenses and certifications
Submission Requirements:
At a minimum, the candidate’s professional resume must include the following:
List of all Educational Achievements
List of all Professional Licenses or Certificates
List of Awards Received
Detailed Employment History with each company including:
o Name & Contact Information of the firm or agency
o Start Date and End Date (Month & Year)
o Positions Held
o List of Projects/Programs Managed including project value, location of assignment, roles and responsibilities, and contribution to each project
At KALCON we are committed to creating an inclusive, diverse, and equitable workplace where every individual is respected and valued. We are an equal opportunity employer and all applicants and employees will receive consideration for employment as we do not tolerate discrimination of any kind based on race, color, religion, gender, sexual orientation, gender identity, national origin, age, disability, genetics, protected veteran status or any other protected characteristic as outlined by federal, state, or local laws. We believe that a diverse workforce contributes to the success of our company and the innovation behind the exceptional projects we deliver. We encourage and support applicants from all backgrounds, experiences, and perspectives to join our team and thrive. Our hiring and employment practices are guided by principles of fairness, equality, and opportunity for all.
Salary Range$150,000—$225,000 USD

## Joonow analysis

Joonow figures for this job, calculated from the jobs open on November 25, 2026.

- **Hiring pace:** KALCON has 17 open jobs on Joonow, in 11 cities. [See the 17 jobs from KALCON](https://www.joonow.com/en/companies/kalcon-qp8tmn0yf7)

[Apply on the company site](https://www.joonow.com/en/job/commissioning-manager-data-center-construction-cedar-rapids-ia-57jqm8k7qz/apply)
