# Construction Scheduler

- **Company:** BB&E
- **Location:** Fort Shafter, HI, US (Not specified)
- **Salary:** Salary not disclosed
- **Contract:** Full-time
- **Posted:** 2026-08-11

## Job description

BB&E is an employee-owned, full-service civil and environmental engineering and consulting firm, headquartered in Northville, Michigan, which services both the Federal and Industrial sectors throughout the United States. BB&E team members provide Environmental Consulting, Facilities Engineering, and Program/Project Management Services to the Federal and private sectors.
Position Summary
BB&E is seeking a dynamic and detail-oriented Scheduler to join our team, supporting the U.S. Army Corps of Engineers (USACE) Honolulu District (POH) Programs & Project Management Division (PPMD) by developing and maintaining resource-loaded Critical Path Method (CPM) schedules in Primavera P6 for an upcoming surge of FY27 projects. Work will be performed on-site at USACE Honolulu District facilities in Honolulu, HI, using Government-furnished computers. This position is contingent upon contract award.
Job Duties & Responsibilities
Input resource loaded Critical Path Method (CPM) schedules into Primavera P6
Enter, monitor, and update resource loaded schedules
Conduct resource analysis and critical path analysis, identifying any resulting impacts or opportunities for Government consideration
Develop all schedules using a modernized Program and Project Management Information Suite (PROMIS) (Primavera Project Manager/P6 Web), Corps of Engineers Financial Management System (CEFMS), and RMS
Run reports in Primavera and develop reports using MS Power BI and other MS applications
Key Qualifications
U.S. Citizenship and the ability to obtain/maintain a NACI/CAC is required
Primavera P6: Proficiency in Primavera P6, with the ability to work independently in the software from day one, is required
Reporting: Experience running reports in Primavera and experience using MS Power BI and other MS applications to develop reports is required
Strong Communication Skills: Ability to effectively communicate both orally and in writing
Requirements
Experience: Fifteen (15) or more years of total relevant experience is required. In addition, a minimum of three (3) full years of experience using Primavera Project Manager/P6 to manage and update resource-loaded CPM project schedules is required
Physical Requirements and Work Environment
The physical demands and work environment may vary based on the position, assigned duties, and work location. Employees must be able to perform the essential functions of the position, with or without reasonable accommodation.
Remain in a stationary position for extended periods
Use computers, telephones, and other office equipment
Move throughout offices, facilities, and project sites
Reach, grasp, handle equipment, and operate controls
Communicate effectively and review documents, equipment, and site conditions
Lift and carry materials or equipment weighing up to 50 pounds when required by the assignment
Stand or walk for extended periods and occasionally climb, kneel, or crouch
Navigate uneven or rough terrain when required
Work indoors and outdoors in varying weather conditions
Occasionally enter confined spaces or work at heights when required
Wear required personal protective equipment
Work in environments that may include noise, dust, fumes, chemicals, electrical hazards, construction activity, or other site specific conditions
Limitations and Disclaimer
This job description describes the general nature and level of work associated with the position. It is not intended to be an exhaustive list of all duties, responsibilities, qualifications, or working conditions. Employees may be assigned other job related duties consistent with applicable law.
The duties and requirements described above are representative of those that may be necessary to perform the essential functions of the position, with or without reasonable accommodation.
Benefits
Competitive compensation packages. $143,000-$185,000 annually. This range represents good-faith compensation for the position at the time of posting. Individual compensation is determined based on several factors, including job responsibilities, relevant experience, education, certifications, technical skills, security clearance status, geographic location, market conditions, internal equity, and contract-specific requirements.
Participation in the Employee Stock Ownership Plan – BB&E is 100% employee-owned!
Discretionary bonus
*Medical, Dental, and Vision Insurance with health care concierge
*Employer provided Short-Term & Long-Term disability
*Employer provided Life insurance
*Employee options for supplemental life, supplemental accident, critical illness, hospital indemnity, and Identity theft protection benefits
*Generous PTO plus 11 paid holidays
Traditional & Roth 401(k) options with fully vested employer match
Tuition reimbursement & professional development
Employee referral program
Financial wellness resources
Employee discounts
Employee Assistance Program (EAP)
Pet insurance discount
*Applies only to full-time employees
*BB&E is an Equal Opportunity Employer and an Affirmative Action Employer. All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, disability, or status as a protected veteran.
BB&E supports pay transparency and is committed to equitable and competitive compensation practices. Compensation for this role will be determined based on several factors, including job responsibilities, relevant experience, education, certifications, technical skills, security clearance status, geographic location, market conditions, internal equity, and contract-specific requirements. Where required by law, compensation ranges will be provided to candidates during the hiring process.

[Apply on the company site](https://www.joonow.com/en/job/construction-scheduler-fort-shafter-hi-d8jzhn5jzn/apply)
