Senior Regional Construction Scheduler

Tiempo completo

  • Los Angeles Metropolitan Area · CA
  • Postulaciones hasta 22/12/2026
  • Publicada hace 66 días
Postularme en el sitio de la empresa

Verificada en la fuente hace 13 h

Con tu cuenta gratuita de Joonow, vas al sitio de la empresa y la vacante queda en tus postulaciones.

Ninguna empresa seria cobra cuotas, cursos, exámenes ni uniformes. ¿Te pareció raro?

Descripción del empleo

KDG Construction Consulting is seeking a detail-oriented Senior Regional Construction Scheduler to join our team supporting the Los Angeles Unified School District (LAUSD).
 

Key Responsibilities

  • Report directly to the Senior Construction Manager of Scheduling and Estimating. Provide various schedule-related reports for upper management to meet Key Performance Milestones.
  • Assist in the supervision of Project Schedulers to ensure project timelines are met and interface with OARs, Senior Project Managers and other site staff related to the review of CPM schedules.
  • Independently interpret and read detailed construction drawings (Architectural, Structural, Mechanical, Electrical, Plumbing, Civil, etc.) and develop a clear understanding of work scope.
  • Review Contractor P6 initial Baseline Construction Schedules and identify any missing scope, identify any missing logic or milestones, identify and analyze the critical path, review the required cost loading, and be able to provide written technical schedule review comments based on LAUSD’s structured review templates.
  • Review multiple Contractor P6 Monthly schedule updates and provide written schedule review comments that document milestone schedule slippage, critical path activity slippage, and provide over-all schedule analysis based on LAUSD’s structured review templates.
  • Perform schedule Time Impact Analysis by using the method of Windows Analysis while incorporating either contemporaneous and/or forensic schedule parameters in a detailed write-up.
  • Read drawings to determine if work is in or out of scope and understand terms and conditions of the contract to determine if any compensable or non-compensable time extensions have merit.
  • Effectively communicate with the project team regarding any schedule/progress related issues or concerns at regular schedule meetings.
  • Develop, maintain, and update various program schedules identifying relationships, logic, milestones, and constraints for construction projects.
  • Perform status updates for Program Schedules/Master Schedules on a regular basis.
  • Ensure proper use of Program-level standard codes, layouts and reports necessary to ensure data integrity
  • Prepare reports as needed and directed by Senior Management. Visit construction sites and attend meetings, as needed, and check the Contractor’s monthly schedule progress.

Required Qualifications

  • Graduation from a recognized college or university with a bachelor’s degree in engineering, architecture, construction management, or any related field.
  • OR
  • Graduation from a recognized college or university with a bachelor’s degree in any course, but with an additional two (4) years of experience in the duties above to compensate for the required education.
  • Minimum ten (10) years full time paid professional experience in Construction Scheduling for an Owner or General Contractor, preferably in an educational facility or public works projects.
  • Proficiency in Primavera Latest Version (P6 v19) and MS Office Suite
Anticipated Salary Range: $160,000.00 – $1850,000.00 per year 

About KDG: KDG Construction Consulting is a leading provider of program, project, and construction management services. The firm serves clients in a broad range of markets throughout Southern California, including transportation, public infrastructure, and large-scale facilities. KDG provides a full spectrum of management and technical services spanning the entire life cycle of a construction project.

Employment with KDG: KDG is an Equal Opportunity Employer, and qualified applicants will receive consideration for employment without regard to race, ethnicity, sexual orientation, gender identity, national origin, veteran status, or disability status.

 

Análisis de Joonow

Cifras de Joonow sobre este empleo, calculadas con los empleos abiertos el 28 de noviembre de 2026.

Ritmo de la empresa

KDG Construction Consulting tiene 3 empleos abiertos en Joonow, en 2 ciudades.

Ver los 3 empleos de KDG Construction Consulting

Prepárate para esta vacante

Postularme