Verificada en la fuente hace 2 h
Con tu cuenta gratuita de Joonow, vas al sitio de la empresa y la vacante queda en tus postulaciones.
Ninguna empresa seria cobra cuotas, cursos, exámenes ni uniformes. ¿Te pareció raro?
Descripción del empleo
The Commissioning Manager serves as the Owner’s Representative responsible for oversight and coordination of the full commissioning lifecycle on large-scale, mission-critical data center projects. This role leads coordination among the General Contractor, commissioning agents, MEP subcontractors, design teams, and Owner personnel to ensure systems are installed, started up, and tested in accordance with Owner specifications and project requirements. The Commissioning Manager develops and maintains the Commissioning Plan and Schedule, tracks readiness, deficiencies, and documentation, and reports on commissioning progress and KPIs to protect turnover milestones and support a clean, timely handover.
Minimum Qualifications
- Bachelor’s degree in Construction Management, Engineering, or a related field preferred, but not required with equivalent trade or superintendent experience
- 7–10+ years of construction or commissioning experience, with at least 5 years in data center projects
- Proven experience supporting commissioning of mission-critical facilities such as data centers, semiconductor facilities, or laboratories
- In-depth understanding of MEP systems, controls integration, and commissioning standards (ASHRAE, NEBB, etc.)
- Ability to read and interpret multi-disciplinary construction drawings and specifications
- Strong written and oral communication skills with the ability to coordinate with stakeholders at all levels
- Proficiency in Microsoft Office Suite, particularly Excel and PowerPoint
- Familiarity with commissioning and project software tools such as CxAlloy, Bluebeam, and Procore
Tasks and Responsibilities
- Serve as the Owner’s Representative overseeing the full commissioning lifecycle of large-scale, mission-critical data center projects
- Lead coordination with all commissioning stakeholders, including the General Contractor, commissioning agents, MEP subcontractors, design teams, and Owner personnel
- Develop and maintain the project Commissioning Plan and Commissioning Schedule, ensuring alignment with construction and turnover milestones
- Collaborate with technical and subject matter experts to draft and review commissioning process documentation in compliance with company and project standards
- Review multi-disciplinary construction drawings and specifications to anticipate and mitigate commissioning-related issues
- Work with the General Contractor and subcontractors to verify that systems are installed and tested in accordance with Owner specifications, state and local codes (UMC, UBC, UPC, NFPA), SMACNA, ASME, and relevant international standards
- Support development of detailed start-up sequences and ensure alignment with the project schedule, developing workarounds and recovery plans where required
- Administer and maintain the commissioning software platform (e.g., CxAlloy), tracking issues, checklists, test results, and closeout documentation
- Coordinate and manage the sequencing of equipment and system start-up activities
- Monitor and track commissioning-related RFIs, submittals, deficiency items, and action items across all active systems
- Conduct and document routine site walks (minimum twice daily) to confirm field readiness for commissioning activities and verify completion of corrective actions
- Interface with General Contractor Cx Managers, engineers, system owners, and vendor technicians to ensure readiness and alignment on testing protocols and responsibilities
- Lead and participate in oversight of Factory Acceptance Tests (FATs), Site Acceptance Tests (SATs), and Integrated Systems Testing (IST), ensuring responsible parties complete required testing and documentation
- Manage and report on commissioning Key Performance Indicators (KPIs) to internal and external stakeholders, including senior project management
- Act as the primary liaison for commissioning activities in Owner-Architect-Contractor (OAC) meetings
- Verify that commissioning documentation meets turnover requirements and supports a clean and timely handover
- Participate in SOP creation and compliance reviews, including audits of SIPPs and Pre-Task Plans
- Resolve technical questions from the field, provide RFI responses, and coordinate with design teams for clarification as needed
Benefits Offered
- Medical insurance
- Dental insurance
- Vision insurance
- Life insurance
- Accident insurance
- Long term disability
- 401(k) retirement plan with 4% KALCON match when an employee contributes at least 5%
- 15 days of paid time off
- 8 paid national holidays
- Reimbursement for professional licenses and certifications
Submission Requirements:
At a minimum, the candidate’s professional resume must include the following:
- List of all Educational Achievements
- List of all Professional Licenses or Certificates
- List of Awards Received
- Detailed Employment History with each company including:
o Name & Contact Information of the firm or agency
o Start Date and End Date (Month & Year)
o Positions Held
o List of Projects/Programs Managed including project value, location of assignment, roles and responsibilities, and contribution to each project
At KALCON we are committed to creating an inclusive, diverse, and equitable workplace where every individual is respected and valued. We are an equal opportunity employer and all applicants and employees will receive consideration for employment as we do not tolerate discrimination of any kind based on race, color, religion, gender, sexual orientation, gender identity, national origin, age, disability, genetics, protected veteran status or any other protected characteristic as outlined by federal, state, or local laws. We believe that a diverse workforce contributes to the success of our company and the innovation behind the exceptional projects we deliver. We encourage and support applicants from all backgrounds, experiences, and perspectives to join our team and thrive. Our hiring and employment practices are guided by principles of fairness, equality, and opportunity for all.
Salary Range$150,000—$225,000 USDAnálisis de Joonow
Cifras de Joonow sobre este empleo, calculadas con los empleos abiertos el 28 de noviembre de 2026.
Ritmo de la empresa
KALCON tiene 17 empleos abiertos en Joonow, en 11 ciudades.
Ver los 17 empleos de KALCON